TAKRAF Transport Crawler Projecto Ferro Carajas, Brazil
Design, manufacture, supply and supervision of erection and commissioning of two transport crawlers
Key Facts

- Plant location
- Projeto Ferro Carajás S11D, Brazil
- Customer
- VALE
- Project scope
- Design, manufacture, supply and supervision of erection and commissioning of two transport crawlers
- Commissioning
- 2018/19
Would you like further information?
Facts and Figures - TAKRAF Transport Crawler Projeto Ferro Carajás S11D, Brazil
| Project figures | Length | 12,1 m |
| Width | 8,8 m | |
| Height (hydraulic cylinders moved in) | 2,08 m | |
| Stroke of hydraulic cylinders | 600 mm | |
| Operating characteristics | Loading capacity out of the center | 500 t |
| Center | 580 t | |
| Operational inclination (longitudinal/transverse) | 15% / 5% | |
| Travel speed | ||
| Without load | 24 m/min | |
| With load | 4,2 m/min | |
| Crawlers | Length | 9,05 m |
| Width | 2,4 m | |
| Center distance between sprockets | 7,5 m | |
| Power of diesel engine | 447 kW |
Related References

Brazil
TAKRAF Transport Crawler RT 500
The transport crawler, designed for a 500 t payload with a 500 mm load eccentricity, features a compact…

