Engineering quality that stands the test of time
At 82 tons, 6.2 m high, 5.2 m long and 2.7 m wide, this is no ordinary gearbox. Installed on an SRs 6300 bucket-wheel excavator at LEAG’s Nochten open-cast mine, it transfers the power of two 1,250 kW motors to the bucket-wheel. The gearbox was manufactured at TAKRAF’s Product & Service Center in Lauchhammer, Germany, in 2015.
Eleven years later, the gearbox returned to Lauchhammer for a comprehensive overhaul. With the excavator’s downtime a key consideration for the customer, all activities were carefully coordinated to keep the maintenance period as short as possible and ensure the gearbox could be returned on schedule.
When the gearbox was dismantled, its condition provided a strong indication of the quality and robustness of the original equipment. Despite more than a decade of demanding mining operation, the gearbox components were found to be in good condition. Gears and rolling bearings were replaced preventively to support reliable operation over the remaining service life of the equipment.
The three-part gearbox housing was subsequently measured in 3D, with particular attention paid to the bearing seats. Where required, worn or damaged areas were prepared for restoration through laser cladding and subsequent machining to restore the required dimensions and fits.
Planning had started well before the gearbox arrived in Lauchhammer. New internal gearbox components had already been pre-assembled and the gear stages completed, helping to substantially reduce the time required for final reassembly.
Following reassembly, the gearbox underwent testing at the Lauchhammer facility. TAKRAF Group regularly performs overhauls of large gearboxes at its Product & Service Center, with gearboxes tested under load before leaving the facility. In this case, the test run was reached after just six weeks, supported by detailed preparation and the commitment of the teams involved.
Lifecycle service backed by OEM expertise
The project highlights a fundamental aspect of TAKRAF Group’s approach to lifecycle services: the relationship with equipment does not end once it has been commissioned.
The Product & Service Center in Lauchhammer specializes in large components for heavy machinery and combines engineering expertise, experienced specialists and dedicated manufacturing and testing capabilities. This enables the Group to support customers not only with the supply of new equipment, but also with inspection, maintenance, refurbishment, replacement parts and technically demanding overhaul work throughout the equipment lifecycle. Service activities account for more than half of the orders handled at the Lauchhammer facility.
The expertise behind the recent overhaul is also rooted in decades of gearbox engineering experience. TAKRAF Group has supplied more than 50 bucket-wheel gearboxes in different sizes since 1998.
Following the successful overhaul and testing program, the 82-ton gearbox left Lauchhammer in early November on a heavy transport for its return to Nochten, ready for its next phase of operation. The project continues the long-standing cooperation between TAKRAF Group and LEAG and demonstrates the value of combining robust original engineering with specialized lifecycle service capabilities.
From original engineering and manufacturing to maintenance and overhaul many years later, TAKRAF Group supports mining equipment throughout its lifecycle, helping customers protect their investments and maintain reliable operations.