Iron Ore Jigging Plant

A DELKOR APIC Jig, the largest in India's iron ore beneficiation industry, was supplied for Jayalaxmi Minerals' greenfield project, capable of handling three material size ranges with advanced control systems for an annual throughput of 1.2 mtpa, converting low-grade iron ore to high grade (60% Fe) with 65% to 70% recovery.

Key Facts

Customer
Jayalaxmi Minerals

Plant location
Karnataka

Commissioning
2011

Size
4 m wide with 3 compartments and 2 gates

Largest jig in the iron ore beneficiation industry in India

A DELKOR APIC Jig was supplied as part of a contract to provide plant engineering for the complete crushing, screening and jigging plant for iron ore beneficiation. The jig, was at the time of the contract, the largest in the iron ore beneficiation industry in India, and is an important reference for 4 m wide APIC Jigs.

The project scope covered the supply of a DELKOR APIC Jig capable of handling three independent size ranges of material. The jig was equipped with state-of-the-art control systems able to treat any material size range without any adjustments to the jig. The jig was provided as part of Jayalaxmi Minerals' greenfield project to establish a beneficiation plant with an annual throughput of 1.2 mtpa, converting low grade to high grade iron ore (>60% Fe) with upgradation and 65% to 70% recovery.

Would you like further information? Please contact us!

The data will be deleted once your request has been processed. You can revoke your consent at any time with future effect by sending an email to . Detailed information on how we handle your data can be found in our privacy policy on our website.

The fields marked with an asterisk * are mandatory fields!

To top