Horizontal Belt Filters
DELKOR supplied two 85 m² horizontal belt filters for Rio Tinto Iron Ore’s Hope Downs 4 Iron Ore Fines Processing Plant. The filters were manufactured in China, South Korea and Australia and were assembled in Perth, Australia before being trucked to site 1,200 km away.
Key Facts

- Customer
- Hope Downs Mine
- Plant location
- Australia
- Commissioning
- 2013
- Equipment size
- 2 x 85 m² HBF's
- Feed rate
- 461 dtph design
Would you like further information?
Belt filter assemblies with vacuum filtrate systems
DELKOR supplied two 85 m² horizontal belt filters for Rio Tinto Iron Ore’s Hope Downs 4 Iron Ore Fines Processing Plant. The filters were manufactured in China, South Korea and Australia and were assembled in Perth, Australia before being trucked to site 1,200 km away.




