Shifting Head for Shiftable Dump Conveyor
TAKRAF delivered a specially designed shifting head for the Vostochny open-pit mine in Kazakhstan, capable of operating at temperatures down to -43°C and adapted to the rail type R 65 per Russian GOST standards.
Datos clave

- Project name
- Shifting head for shiftable dump conveyor
- Customer
- Euroasiatic Energy Corporation
- Plant location
- Open-pit mine Vostochny
- Commissioning
- 2009
- Type of shifting head
- hydraulically actuated
- Rail type
- R 65 according to GOST standard
- Belt width of shiftable conveyor
- 1,800 mm
- Temperature range for operating
- from -43°C to +40°C
¿Le gustaría más información?
