Overland Conveyor System
Molybdenum ore is moved from the underground mine to processing facilities via a chain of belt conveyors, primarily using the tunnel conveyor PC 2, one of the largest conveyors globally with a length of 16,820 m and a lift of 471 m, and the overland conveyor PC 3, which follows the natural terrain with horizontal and vertical curves.
Datos clave

- Project name
- Overland conveyor system
- Customer
- Climax Molybdenum Co.
- Plant location
- Henderson mine in Granby, Colorado
- Commissioning
- 1999
- Length/lift
- 16,820 m / 471 m
- Theoretical output
- 1,420 m³/h – 2,500 st/h
¿Le gustaría más información?
