Tube Conveyor
The tube conveyor was chosen to transport residual materials (ash and gypsum) from the power plant to the disposal area for its environmentally friendly operation and routing that follows the natural terrain with tight horizontal and vertical curves, utilizing an advanced belt training system for proper discharge positioning.
Datos clave

- Project name
- Maritza East 1 power plant residual transport
- Customer
- AES
- Plant location
- Power plant, Maritza East
- Commissioning
- 2010
- Length
- 4,535 m
- Capacity
- 1,400 t/h
¿Le gustaría más información?