Mobile Stacking Bridge
Mobile Stacking Bridges (MSBs) allow continuous operation without interruptions in heap leach systems, offering reduced maintenance, lower costs, and a dual-side dumping capacity.
Datos clave

- Project name
- Leach pad stacking & reclaiming system Gaby
- Customer
- Codelco
- Plant location
- Gaby
- Commissioning
- 2007
- Design capacity
- 8,300 t/h; 5,200 m³/h
¿Le gustaría más información?
