Mobile Stacking Bridge
TAKRAF supplied a copper ore leaching system, including an agglomeration plant and on/off leach pad, featuring a Mobile Stacking Bridge (MSB) that allows continuous operation without downtime, reduces costs and maintenance, and includes a retractable tripper stacker conveyor for dual-side dumping.
Datos clave

- Project name
- Proyecto Antucoya
- Customer
- Minera Antucoya Ltda
- Plant location
- Atacama Desert / Northern Chile
- Commissioning
- 2015
- Design capacity
- 6,288 t/h; 4,057 m³/h
¿Le gustaría más información?
