Stackers for Coal
The two stackers operate with one reclaimer on the same rail track, have a shared feeding conveyor with a bypass system on the first stacker, and feature slewable and luffable designs for automatic or remote operation from the control room.
Datos clave

- Project Name
- Caval Ridge
- Customer
- BMA – BHP Billiton Mitsubishi Alliance
- Commissioning
- 2014
- Material
- Coal
- Stacking capacity
- 2,900 t/h
¿Le gustaría más información?
