Mobile Stacking Bridge
Mobile Stacking Bridges (MSBs) operate continuously without interruption and offer advantages like reduced maintenance and costs, increased design reliability, and dual-side dumping capability.
Datos clave

- Project name
- Dry Tailing Stacking and Conveying System, Guelb II
- Customer
- SNIM
- Plant location
- Iron Ore Processing Plant Zouérat / Mauritania
- Commissioning
- 2015
- Design capacity
- 880 tph; 489 m³ph
¿Le gustaría más información?
